Skip to content
Case Studies
Increased Throughput & Capacity
Before
Before
The company had sorter that was very old.
The old sortation system ran 19 chutes and able to pack 54 cartons at one time.
The equipment was outdated, slow and required high maintenance. This reduced throughput capacity.
134 pairs packed per man hour.
After
AIOI installed light system running 17 chutes and pack 272 cartons at one time.
183-200 pairs packed per man hour.
Ability to ship e-commerce order out at the same-day before 4:00 p.m.
Downsized from 3 to 2 shifts.
No single employee downsizing.
37% increase in productivity
After
Before
The company had sorter that was very old.
The old sortation system ran 19 chutes and able to pack 54 cartons at one time.
The equipment was outdated, slow and required high maintenance. This reduced throughput capacity.
134 pairs packed per man hour.
After
AIOI installed light system running 17 chutes and pack 272 cartons at one time.
183-200 pairs packed per man hour.
Ability to ship e-commerce order out at the same-day before 4:00 p.m.
Downsized from 3 to 2 shifts.
No single employee downsizing.
37% increase in productivity
Solution
Solution
The system fit perfectly for the customer.
It provided the capacity and the reliability they needed with further rooms to grow.
They can handle all the multi channel requirements with this in JUST one system.
Your browser does not support the video tag.
Our Products
More than 1000+ lights available in different series
Projection Picking Systems
Book Your Slot For AIOI Showroom
Can’t get enough? Sign up for our Showroom Demo for better understanding of our products & solutions. Know more about AIOI Showroom. We’d love to stay in touch.